Changeover ATS - 100 Amp ABB Compact
Professional automatic transfer switch for seamless changeover between mains power and generator supply during electrical failures. Manufactured in-house using high-quality components with full testing and documentation.
-
Generator ATS Communication Cable,
Suitable for The DHY Series Generator
-
Standard Product Specification for Mains to Generator Operation
2 x 3 Pole AC1 Rated Contactors, Electrically & Mechanically Interlocked "break before make"
Mains (Utility) – Delay On Load Timer ( Pre Set 10sec )( Adjustable 0.3 Sec – 30 Hrs )
Generator – Delay On Load Timer ( Pre Set 30sec ) ( Adjustable 0.3 Sec – 30 Hrs )
Set Rated Fuses for control circuit
Set Volt Free Contacts for remote Start Facility ( 2 Wire Start )
Deep-Sea - 12v 3A Dc Battery Charger
Auto Test Facility Switch, Primary Mains Failure simulation
Mounted Within a 300 x 300W x 200D Steel Enclosure, with Top & Bottom Removable Gland Plates.
IP65 Rated RAL7032 With Lockable Door 1 Key Supplied & Wall Mounting Brackets
LED Indication
Mains Available (GREEN), Mains On Load (RED)
Generator Available (GREEN), Generator On Load (AMBER)