Search
Filters
Close
Here At Blades Power, we have a full range of Automatic Transfer Switches Manufactured In House Using Only UK Suppliers. They are built to the highest standard, all panels are fully tested and issued with a serial No. Every Panel is dispatched with a copy of the Electrical Schematic and test report + All Datasheets for each electrical internal part.
Manufacturer part number: ABB41000MG
Delivery date: 6-8 Weeks
Manufacturer: Blades Power Generation
Call for pricing

Product Specification for Mains to Generator Operation of 1000 Amp ABB 3 Phase N

1) 2 x 4 Pole AC1 Rated Contactors, Electrically & Mechanically Interlocked “break before make”
2) Phase Failure Relay For Mains Monitoring
3) Mains (Utility) – Delay On Load Timer ( Pre Set 10sec )( Adjustable 0.3 Sec – 30 Hrs )
4) Generator – Delay On Load Timer ( Pre Set 30sec ) ( Adjustable 0.3 Sec – 30 Hrs )
5) 10 Amp Mains L1- 240v A/c Auxiliary Supply For ( B/Charger / W/Heater)
6) Set Rated Fuses for control circuit
7) Mains On Load Volt Free Contact ( For BMS )
8) Generator On Load Volt Free Contact ( For BMS )
9) Set Volt Free Contacts for remote Start Facility ( 2 Wire Start )
10) Mounted Within an all Steel Enclosure, with Top & Bottom Removable Gland Plates.
IP65 Rated RAL7032 With Lockable Door 1 Key Supplied & Wall Mounting Brackets


LED Indication
Mains Available (GREEN), Mains On Load (RED)
Generator Available (GREEN), Generator On Load (AMBER)

 

We also have alternative Contactor Options from

LOVATO –

TERASAKI –

ICG –

If you require different manufacture, please contact and we will add these to our range.

 

ADDITIONAL OPTIONS IF REQUIRED- IF NOT SHOWN PLEASE CALL FOR PRICING

Auto Test Facility Switch With 2 Keys, Primary Mains Failure simulation

Deep-Sea - 12v & 24V Dc Battery Charger

Modbus RS485 Connections Available

Digital Metering For Voltage / Current  - Including Current Transformers

Product Specification for Mains to Generator Operation of 1000 Amp ABB 3 Phase N

1) 2 x 4 Pole AC1 Rated Contactors, Electrically & Mechanically Interlocked “break before make”
2) Phase Failure Relay For Mains Monitoring
3) Mains (Utility) – Delay On Load Timer ( Pre Set 10sec )( Adjustable 0.3 Sec – 30 Hrs )
4) Generator – Delay On Load Timer ( Pre Set 30sec ) ( Adjustable 0.3 Sec – 30 Hrs )
5) 10 Amp Mains L1- 240v A/c Auxiliary Supply For ( B/Charger / W/Heater)
6) Set Rated Fuses for control circuit
7) Mains On Load Volt Free Contact ( For BMS )
8) Generator On Load Volt Free Contact ( For BMS )
9) Set Volt Free Contacts for remote Start Facility ( 2 Wire Start )
10) Mounted Within an all Steel Enclosure, with Top & Bottom Removable Gland Plates.
IP65 Rated RAL7032 With Lockable Door 1 Key Supplied & Wall Mounting Brackets


LED Indication
Mains Available (GREEN), Mains On Load (RED)
Generator Available (GREEN), Generator On Load (AMBER)

 

We also have alternative Contactor Options from

LOVATO –

TERASAKI –

ICG –

If you require different manufacture, please contact and we will add these to our range.

 

ADDITIONAL OPTIONS IF REQUIRED- IF NOT SHOWN PLEASE CALL FOR PRICING

Auto Test Facility Switch With 2 Keys, Primary Mains Failure simulation

Deep-Sea - 12v & 24V Dc Battery Charger

Modbus RS485 Connections Available

Digital Metering For Voltage / Current  - Including Current Transformers

Products specifications
Component Manufacture ABB
Amp Rating 1000 Amp
Requirement Industrial 3 Phase + N 415v
IP55 All Steel Enclosure IP55 Floor Or Wall Mounted Enclosure
Products specifications
Component Manufacture ABB
Amp Rating 1000 Amp
Requirement Industrial 3 Phase + N 415v
IP55 All Steel Enclosure IP55 Floor Or Wall Mounted Enclosure