Generator Manual Changeover Switch: 2 Pole or 4-Pole?

You have purchased a standby generator with a matching amp-rated manual changeover switch. But what about switching the neutral? This will determine if your manualtransfer switch generator in the UK is safe and working as intended. Here at Blades Power Generation, we can help commercial property owners, contractors and installers decide which option to choose.

2 Pole or 4 Pole Switch

The number of poles on a changeover switch tells you how many conductors are being switched.

Single Phase

A 2-pole changeover switch means that the line and neutral will be switched. This allows the neutral configuration of both sources to remain. A single pole changeover switch will only switch the line and is rarely suitable for a bonded neutral generator.

Three Phase

A three-pole changeover switch will switch all three lines but will leave the neutral live. A four-pole changeover switch will switch all three lines and the neutral. This will prevent the generator from having a parallel neutral bond, as the generator has its own bond.

Generator Manual Changeover Switch UK

We always look at the generator first when specifying a generator manual transfer switch in the UK. We will look at:



  • Is the generator neutral bonded, floating or optional?
  • What type of supply are you on (TN-C-S, TN-S, TT)?
  • Single-phase or three-phase?

Example: TN-C-S Supply and Bonded Generator

Imagine a commercial unit on a 3-phase TN-C-S supply. The neutral and earth have been combined by the network operator and will be bonded at the point of origin. The generator owner has installed a standby generator with a bonded neutral.

 

Using a 3-pole changeover switch, the neutral will still be live on both sources. A 4-pole changeover switch will disconnect the neutral. Many sites will be different, so your designer should check the generator manual transfer switch in the UK, earthing and protective devices.

How We Can Help

Here at Blades Power Generation, we will look at your generator, earthing and installation requirements to recommend the correct configuration. Contractors and installers can ask us for a second opinion on your specification. This will reduce any surprises during commissioning, ensure the switch is suitable for your generator and give you clear information to pass to your designer.

 

By correctly specifying a manual transfer switch generator in the UK, you can ensure your people, equipment and investment are protected. The choice between a 2-pole or 4-pole switch will depend on your generator and earthing.

Please send us your generator details and site information, and we will help you select the correct switch configuration.

Need a manual transfer switch?

Everything in this article is something we build and supply — configure it online or call 01453 799655.

Configure now →

Leave your comment

*