Generator Manual Changeover Switch: 2 Pole or 4-Pole?

You have purchased a standby generator with a matching amp-rated manual changeover switch. But what about switching the neutral? This will determine if your manualtransfer switch generator in the UK is safe and working as intended. Here at Blades Power Generation, we can help commercial property owners, contractors and installers decide which option to choose.

2 Pole or 4 Pole Switch

The number of poles on a changeover switch tells you how many conductors are being switched.

Single Phase

A 2-pole changeover switch means that the line and neutral will be switched. This allows the neutral configuration of both sources to remain. A single pole changeover switch will only switch the line and is rarely suitable for a bonded neutral generator.

Three Phase

A three-pole changeover switch will switch all three lines but will leave the neutral live. A four-pole changeover switch will switch all three lines and the neutral. This will prevent the generator from having a parallel neutral bond, as the generator has its own bond.

Generator Manual Changeover Switch UK

We always look at the generator first when specifying a generator manual transfer switch in the UK. We will look at:



  • Is the generator neutral bonded, floating or optional?
  • What type of supply are you on (TN-C-S, TN-S, TT)?
  • Single-phase or three-phase?

Example: TN-C-S Supply and Bonded Generator

Imagine a commercial unit on a 3-phase TN-C-S supply. The neutral and earth have been combined by the network operator and will be bonded at the point of origin. The generator owner has installed a standby generator with a bonded neutral.

 

Using a 3-pole changeover switch, the neutral will still be live on both sources. A 4-pole changeover switch will disconnect the neutral. Many sites will be different, so your designer should check the generator manual transfer switch in the UK, earthing and protective devices.

How We Can Help

Here at Blades Power Generation, we will look at your generator, earthing and installation requirements to recommend the correct configuration. Contractors and installers can ask us for a second opinion on your specification. This will reduce any surprises during commissioning, ensure the switch is suitable for your generator and give you clear information to pass to your designer.

 

By correctly specifying a manual transfer switch generator in the UK, you can ensure your people, equipment and investment are protected. The choice between a 2-pole or 4-pole switch will depend on your generator and earthing.

Please send us your generator details and site information, and we will help you select the correct switch configuration.

Automatic Changeover Switch When Mains Voltage Sags

An automatic changeover switch protects against complete power outages. However, sites can be affected by voltage dips and/or missing phases. Although there is some main supply, sensitive plant/equipment can suffer. At Blades Power Generation, we know these issues create difficulties for site managers, as the generator is delayed because a complete failure isn't identified.

Complete Failure v Abnormal Supply

If a system is set up to simply switch to generator on complete loss of supply, and not detecting partial failures, voltage dips may be missed. Within this scenario, equipment will continue to be affected by faulty supply and the generator will not engage.

Starting the Generator Before Complete Failure

It is important to have the correct switching logic. If the main supply is unreliable, the generator should start, and once it is ready, the load should be transferred. With source interlocking in place, it cannot be connected to both the main supply and the generator.

Returning to Main Supply

It is important to have a good switching set-up so that, when returning to the main supply, the system will only switch once the supply is stable.

 

Standard changeover switches will disconnect the supply and then connect the new supply. This causes a small interruption to supply. If this cannot be tolerated by your process, please let us know at an early stage so we can discuss options for you.

Selecting an Automatic Load Transfer Switch in the UK

To select an automatic load transfer switch in the UK for a 3-phase industrial application consider the following:


  • Number of Phases: Is it single-phase or three-phase?
  • Rating: Ensure it is rated for your full load, plus a sensible overload.
  • Generator compatibility: Ensure the system and control unit are compatible with your generator.
  • Control Unit Specification: Ensure it detects the problems that may occur at your site.

Improved Reliability at Blades Power Generation

We design bespoke ATS panels and 3-phase systems specific to your site. Using Deep Sea monitoring, we monitor the supply. We provide engineering support to design and set up your switching so that it is suitable for the issues that occur at your site.

If you are experiencing regular voltage dips and/or single-phase issues within your site, please give us details of the supply conditions, generator set-up and switching requirements. Our engineering team will be able to help you specify an Automatic Changeover Switch to allow quick switching, preventing issues with your equipment.